PERI US in the press

Here you can read all of our latest news and press releases.

 

Latest News & Releases

    02
     
    Oct

    press article

    From the Beginning: Scaffolding Planning for the Modern Construction Environment

    By its nature, scaffolding is essential for nearly every construction project – a high-rise building in a dense urban area, an expansive energy facility charged with processing natural gas, or a new bridge spanning across a river. It is the critical temporary skeleton surrounding the building to be built, providing workers with necessary access to hard-to-reach places and heights.
    02
     
    Jun

    press article

    Major investment in new technology: New coating facility put into operation at the PERI plant in Weißenhorn

    PERI invests around EUR 60 million in new technologies and innovative manufacturing processes at its Weißenhorn headquarters. New PERIskin coating technology: improved corrosion protection with around 80% lower energy consumption
    18
     
    Apr
    Recent innovations in bridge formwork aim to make the construction process safer, faster, and more efficient for workers on site.
    Custom-engineered systems with PERI VARIOKIT Balanced Cantilever (VBC) formwork travelers.
    The Speed Column configuration of the VARIOKIT Pier System (VPS) features fast handling and high pouring rates and results in excellent concrete finish.

    press article

    The Evolution of Bridge Construction: Safer, Faster, Smarter

    Why Innovative Formwork Systems Are Key to Enhancing Bridge Construction

    Your daily commute likely takes you over heavily traveled bridges both large and small, whether you are in your own car or using public transportation. Each span provides crucial connectivity between communities in the region, allowing you to cross a major river, a small stream, or perhaps another roadway below. The burning question: How safe are those bridges you cross every day?
    16
     
    Apr
    Alpha Column Formwork System

    press article

    PERI Formwork Systems, Inc., to Drive Greater Efficiency and Safety with Alpha Column Launch

    Imperial Column Formwork Enables Crews to Reach Greater Dimensions Safely on Site

    PERI Formwork Systems launches the Alpha Column, an efficient and safe solution for rectangular and square columns up to 36"x36". Designed to meet growing US construction demands, it integrates user-friendly features and reduces on-site material, enhancing safety and efficiency.
    03
     
    Apr
    Hampton Roads Tunnel, Virginia

    news article

    PERI Expands Capabilities with Acquisition of KERN Tunneltechnik SA, Kicking Off Major U.S. Tunnel Project

    Combined Companies Begin Collaboration on Massive Tunnel Project in Virginia

    PERI Formwork Systems, Inc. has acquired KERN Tunneltechnik SA to deliver advanced tunneling solutions for large-scale infrastructure projects. This strategic partnership enhances PERI's ability to offer cutting-edge tunnel formwork systems and machinery. The first collaboration is the Hampton Roads Tunnel expansion, the largest tunnel project in Virginia’s history, aimed at increasing roadway capacity and easing congestion. Completion is expected by 2027.
    03
     
    Apr
    The TwistBlocks are hollow concrete blocks that can be slotted together without mortar to form a wall. The building blocks are produced particularly easily and quickly using specially developed formwork, namely the TwistBlock moulds from PERI.

    news article

    The first PERI school in Kenya

    Every year, PERI helps build a school in a developing country using innovative technology like PERI TwistBlocks to make construction more affordable and efficient.
    15
     
    Feb

    press article

    PERI Formwork Systems, Inc., to Showcase Bridge Construction Solutions at ASBI Webinar

    LAX People Mover Project to Be Featured During Feb. 28 Presentation

    PERI Formwork Systems, Inc. will present its innovative formwork solutions for bridge construction in a webinar hosted by the American Segmental Bridge Institute (ASBI) on February 28, 2024. The webinar, titled “Cast in Place Segmental Success at LAX with Form Travelers,” will highlight PERI's technologies used in the Los Angeles International Airport Automated People Mover project. The session will focus on the use of the VARIOKIT Balanced Cantilever Carriage System in constructing a cast-in-place segmental bridge over active highways, a first for PERI in the U.S. Attendees can earn a Professional Development Hour certificate.
    22
     
    Jan
    A forklift operator moves scaffolding materials to the job site.

    press article

    Renting vs. Owning: The Scaffolding Dilemma

    Top Considerations for Construction Professionals

    When undertaking a new construction project, the mathematics involved are usually very complex. A large list of considerations is at play for architects, contractors, and installers to meet the requirements and demands of the project from beginning to end. The selection of material plays a big role in the success of the project, both in the short term and long term. Ensuring that the project can be completed on time, safely, and efficiently is also critical to a building’s overall performance.
    09
     
    Aug
    Peri Houston 3D 1
    Peri Houston 3D 2
    Peri Houston 3D 3

    press article

    PERI 3D Construction Custom Prints Nation’s Largest 3D Printed Home

    3D printed construction continues to have a measurable impact on the industry because of its ability to reduce costs and increase efficiency. The latest example is in Spring Branch, Texas, now the home of the first multi-story 3D printed house in the United States. 
    19
     
    Oct
    VARIOKIT Pier System (VPS)

    press article

    PERI to Showcase Innovative Bridge Formwork Solutions at 2022 ASBI Annual Convention

    PERI Formwork Systems, Inc., one of the leading manufacturers and suppliers of formwork and scaffolding systems for today’s construction environment, will showcase its innovative formwork solutions for bridge construction when it serves as an exhibitor at the upcoming American Segmental Bridge Institute (ASBI) 2022 Convention (October 30-November 2, 2022 in Austin, TX). The annual event brings together members of the ASBI, an organization focused on advancing the quality and use of concrete segmental bridges.
    13
     
    Jul
    PERI VPS
    PERI VPS
    PERI VPS

    press article

    PERI Formwork Systems, Inc. Announces VARIOKIT Pier System To Revolutionize Bridge Construction

    Innovative VARIOKIT Pier System Bridges Safety and Efficiency

    PERI Formwork Systems, Inc., one of the leading manufacturers and suppliers of formwork and scaffolding systems for today’s construction environment, is setting a new industry standard for bridge construction with the introduction of the company’s VARIOKIT Pier System (VPS). VPS bridges the gap between safety and efficiency to provide a versatile, rentable, and high-performing system for the smart construction of bridge columns and caps.
    16
     
    May
    PERI Formwork Systems, Inc

    press article

    When "We're Hiring" No Longer Works

    From healthcare and retail to building and construction, the ongoing nationwide labor shortage is having a far-reaching impact on almost every industry. Companies of all kinds are marshaling their resources to find enough employees with the right skill sets that will enable them to thrive as an organization.
    10
     
    May
    Kosciuszko Bridge
    Kosciuszko Bridge
    Kosciuszko Bridge

    press article

    NYC Bridge Gets a New Lease on Life

    When it came to formwork for concrete construction on the bridge, the contractor for the project – Granite Construction – turned to PERI to deliver formwork solutions that would drive efficiency while keeping construction crews safe.
    21
     
    Apr
    A new flat slab bridge is replacing the existing Valencia Bridge
    customer-engineered truss system
    Custom Bridge Construction

    press article

    Case Study: Valencia Bridge, Fairfield County, SC

    In Fairfield County, South Carolina, a new flat slab concrete bridge is replacing the existing Valencia Bridge over Dutchman's Creek, a partially collapsed bridge of concrete piers, timber pile caps, timber decking, and timber wearing boards. 
    02
     
    Feb
    Case Study: East End Bridge Construction, Ohio River
    Case Study: East End Bridge Construction, Ohio River

    press article

    Connecting Communities, Providing Convenience

    East End Bridge

    The East End Bridge is a cable-stay bridge that connects Louisville and Southern Indiana over the Ohio River. The new span improves cross-river mobility and safety and alleviates traffic congestion in both Louisville and Utica, Indiana. It provides access for residents commuting between counties and enables travelers passing through the region to bypass the urban traffic of downtown Louisville.
    24
     
    Jan

    press article

    PERI USA CEO Named One of CEO Monthly’s CEO of the Year

    Strydom Groenewald Recognized for Leadership and Commitment

    PERI Formwork Systems, Inc., one of the leading manufacturers and suppliers of formwork and scaffolding systems for today’s construction environment, is honored to announce the recognition of PERI USA CEO Strydom Groenewald as a CEO of the Year nominee by CEO Monthly.
    11
     
    Jan
    PowerGen Logo

    press article

    PERI to Showcase Game-Changing Planning Tool, Innovative Scaffolding Solution

    PERI Formwork Systems, Inc.,one of the leading manufacturers and suppliers of formwork and scaffolding systems for today’s construction environment, will be highlighting a highly advantageous technology solution and one of its core scaffolding systems when it serves as an exhibitor at POWERGEN 2022. Dubbed the energy and utility industry’s largest summit and networking hub, the event is being held January 26 to 28, 2022, in Dallas, Texas.
    06
     
    Jan
    PERI USA Formwork used for LAX Automated People Mover
    PERI Formwork Systems, Inc. used at LAX
    PERI Formwork at LAX

    press article

    LAX Automated People Mover

    Welcome to the New LAX

    Los Angeles International Airport has undertaken an effort to relieve congestion for people traveling to and from the third-busiest airport in the world. A key component of that endeavor is a new 2.25-mile-long Automated People Mover (APM).
    14
     
    Dec

    press article

    PERI Formwork Systems Prepares for Change in Construction Paradigm, Appoints New Sales Leadership

    Company Taps Industry Veterans to Spearhead Sales as Infrastructure Investment Takes Off

    PERI Formwork Systems, Inc., one of the leading manufacturers and suppliers of formwork and scaffolding systems for today’s construction environment, has tapped three industry veterans to lead enterprise-wide sales efforts as the nation prepares for the first sizable investment in infrastructure construction in decades.
    02
     
    Dec
    PERI Centene Corp Formwork Scaffolding Engineering
    PERI Centene Corp East Coast HQ Charlotte NC Exterior
    PERI Centene Corp Men at Work

    press article

    Centene Corporation East Coast Headquarters Charlotte, NC

    Transforming Healthcare

    The team turned to PERI USA to deliver a custom-engineered formwork and shoring system on a tight turnaround that would keep them safe and on schedule for Phase 1, including the East tower and parking garage. 
    02
     
    Nov
    Construction Conference

    press article

    PERI Formwork Senior Vice President Selected as Keynote Speaker at LEAP HR: Construction Conference

    Bernadette Pearson to Showcase New PERI Initiatives at December Event

    PERI, one of the world’s leading manufacturers and suppliers of formwork and scaffold systems, will serve as a key contributor to the conversation about human resources best practices at the upcoming LEAP HR: Construction Conference this winter. Bernadette Pearson, senior vice president of human resources, is one of the featured speakers at the event, an industry-leading conference for human resources professionals to uncover new ways of thinking about the profession. The conference runs from December 6 through 8, 2021, in Dallas, Texas.
    05
     
    Oct

    press article

    PERI USA Turns Customer Surveys Into Donation for Habitat for Humanity

    Company Raised $4,000 for Nonprofit's Chicago Chapter

    PERI Formwork Systems, Inc., one of the world’s leading manufacturers and suppliers of formwork and scaffold systems, recently raised money for Habitat for Humanity Chicago based on the participation it received during a three-month survey of its customers.
    29
     
    Sep
    DUO-Plywood
    DUO-Plywood

    press article

    Avoiding the Plywood Pricing Perils

    PERI’s DUO Delivers Post-Pandemic

    For decades, lumber, steel, aluminum, and plywood have been the standard in U.S. formwork. Enter a global pandemic that has disrupted supply chains and caused huge spikes in the price of lumber and steel, and the paradigm has changed for everyone in the construction industry.
    27
     
    Sep

    press article

    The Loop at Mattapan Station

    The Loop at Mattapan Station in Boston, Massachusetts, is a mixed-use redevelopment project adjacent to the Mattapan MBTA Red Line Station. The project includes a new building with 135 residential units and 10,000 square feet of commercial retail space. The transit-oriented property will provide affordable and market-rate housing, a variety of transportation options, and direct access to the Neponset River Greenway.
    20
     
    Sep
    Salesforce Tower Chicago
    Salesforce Tower Chicago
    Salesforce Tower Chicago

    press article

    The Final Riverfront Development Site

    The Walsh Group turned to the expertise of PERI Formwork Systems, Inc., to deliver a flexible, coordinated formwork solution utilizing just-in-time delivery of all materials and flexibility to climb independently of the tower crane.
    15
     
    Sep
    Peri 3D Printing
    Peri 3D Printing

    press article

    A Long-Lasting Imprint

    How 3D Printing Could Revolutionize the Construction Industry

    Across the manufacturing sector, automation has driven a monumental shift in processes and productivity. Take an entry-level employee, place them in front of a machine, have them program that machine, and a manufacturer can triple or quadruple the output of their operations. Rather than creating something by human hands, machines and automated processes deliver higher precision at higher volumes. Such advancements have revolutionized the production of everything from windows to automobiles. 
    20
     
    Jul

    press article

    QuickSolve Upgrades Empower Contractors with Even More Powerful Online Planning Tool

    Enhanced Web-Based Platform Streamlines Data Capture, Provides Greater Functionality

    An enhanced edition of PERI QuickSolve, a free web-based planning tool that empowers contractors and estimators to sketch out a project and identify the best wall formwork solutions based on the specific characteristics of that project was just launched.
    01
     
    Feb
    Update

    press article

    2021 COVID-19-Update

    A Message To Our Valued Clients

    COVID-19 continues to affect all of us - we continue to do everything we can to keep you going. Changes made in 2020 will continue in 2021 as we enter a new year, reinvigorated and inspired. 
    02
     
    Nov
    The Kennedy Center is the largest arts centre in the American capital. The extension project “The REACH” has seen the construction of three additional buildings at the centre.
(Photo: Cowles Graphic Design)

    press article

    PERI Architectural Concrete Project “The REACH” wins ACI Overall Excellence Award

    The building extension at the imposing Kennedy Center for the Performing Arts is commonly known as “The REACH”. It comprises three interconnected pavilions that stand out due to their exceptional architectural design and architectural concrete of the highest quality. The larger-than-life project won the American Concrete Institute’s Overall Excellence Award in October 2020 and is thus recognized as a project that unites particularly creative techniques with innovative technologies. For this special construction project, PERI developed a formwork concept that combined tried-and-tested standard systems with project-specific solutions.
    29
     
    Sep
    PERI prints first residential building in Germany with portal printer BOD2 in Beckum (North Rhine-Westphalia)
    PERI 3D-construction printing process

    press article

    PERI builds the first 3D-printed residential building in Germany

    PERI GmbH is building Germany’s first 3D-printed residential building in Beckum, North Rhine-Westphalia. The two-story detached house with approx. 861 square feet of living space per floor is not being constructed in a conventional manner, it is being printed by a 3D construction printer.
    27
     
    Mar
    Update

    press article

    COVID-19-Update

    A Message To Our Valued Clients

    COVID-19 is affecting all of us - we want to assure you that we are doing everything we can to keep you going.
    19
     
    Mar
    PERI at ConExpo 2020

    press article

    ConExpo 2020

    PERI was one of over 2,300 exhibitors at the show. Our newest products on display include our PD-5 Shoring System, Heavy Duty Column Form and Modular Dancefloor System. The latter of the two being debuted for the very first time.
    10
     
    Jan

    press article

    Reorganization of our Sales Team

    PERI USA is excited to announce some changes in the structure of our sales team.
    02
     
    Oct
    PERI's new frame scaffold shoring tower

    press article

    PD-5 Frame Shoring Tower

    PERI’s Take on 10K Shoring Towers

    Formwork Manufacturer PERI has launched a new lightweight frame shoring tower, PD-5.
    02
     
    Sep
    Using the mouse buttons and wheel, the user can zoom, pan and rotate to view the 3D model from all angles.

    press article

    PERI QuickSolve | DUO Planner

    A Simple, Free Online Tool For Planning Your Formwork Layout in 3D

    Formwork Manufacturer PERI has published a free web based tool for formwork estimation, with automatic material list calculation and 3D capabilities. Aimed to create quick estimates on-the-go.
    02
     
    May
    The project-specific solution for realising the inner lining was based on a moveable supporting structure consisting of system components taken from the VARIOKIT Engineering Construction Kit.

    press article

    VARIOKIT tunnel formwork solution deep in the heart of the Golden City

    With construction work being carried out in depths up to 30 metres in the centre of the city famous for the Golden Gate Bridge, an enormous building structure is being realised. When completed, the Chinatown Subway Station will form the northern end of San Francisco's Central Subway System. The new station will significantly improve access to public transport in some of the city's most densely populated areas. The architectural requirements presented the contractor with enormous challenges. PERI developed a project-specific solution based on the VARIOKIT Engineering Construction Kit in order to economically construct the inner lining.
    12
     
    Mar
    The new Kosciuszko Bridge is a key element of the Brooklyn Queens Expressway
    The Contractor chose PERI's RCS Rail Climbing System for the construction of the 200 ft. tall pylons
    The tieless formwork solution significantly reduced labor and patching costs.

    press article

    Kosciuszko Bridge Replacement, New York

    PERI provides climbing formwork for the new Kosciuszko Bridge, a key element of the Brooklyn Queens Expressway on the east end of Long Island in New York City.
    30
     
    Oct
    In Copenhagen the so-called "BOD" ("Building on Demand") was printed with a 3D concrete printer from COBOD. This office building is the first 3D printed building in Europe.
    New Impulses for 3D printing in the construction industry.
    COBOD 3D printer

    press article

    Strategic Partnership with Danish technology leader in 3D concrete printing

    PERI Group acquires stake in COBOD International A/S

    The PERI Group, one of the world's leading companies in the field of formwork and scaffolding for the construction industry, acquires a stake in the Danish 3D concrete printing specialist COBOD International A/S based in Copenhagen.
    22
     
    Oct
    This will shorten lead times and reduce freight costs for contractors renting formwork and scaffolding in the greater New York metro area.
    Bridgewater’s Mayor Daniel J. Hayes, Jr. (left) welcomed PERI USA and Global Director of the PERI Group Alexander Schwoerer (right) to Bridgewater and is excited about the new jobs and increase in business PERI is bringing to the area.
    An Oktoberfest style tent was set up in the yard.

    press article

    Grand Opening Of PERI USA’s New Yard and Office in Bridgewater, New Jersey

    PERI, one of the largest formwork and scaffolding rental suppliers to the construction industry worldwide, is pleased to announce the opening of their New Jersey yard and office. The Grand Opening of the new facility was held on October 17, 2018.
    28
     
    Sep
    PERI DUO is answering the needs of concrete contractors, a column form that is light, strong, and available in US measurements.

    press article

    NEW: DUO Column Formwork

    Now available in imperial measurements

    PERI’s handset column formwork DUO now available in imperial sizes allowing forming of concrete columns up to 24x24 inches
    04
     
    Jul

    press article

    Building A Home For A St. Louis Hero With PERI DUO Formwork

    PERI Teamed up with McCarthy and the St. Louis Community to support building a home for a police officer tragically injured in the line of duty.

    For the construction of this home that is being built for an officer that was injured in the line of duty, McCarthy has donated the foundation and the labor and PERI has donated the concrete forms.
    24
     
    May

    press article

    PERI bundles BIM activities

    Importance of BIM further strengthened

    Weißenhorn. PERI, one of the world's largest manufacturers and suppliers of formwork and scaffolding systems, has been a pacesetter on the road to the future of digital construction for many years now. In 2017, the family‑owned company founded a Digital Transformation Office whereby all of PERI's digitalization‑related strategic activities and initiatives would be grouped together and coordinated. Furthermore, the PERI BIM Competence Center, which has existed since 2015, has also been integrated into the Digital Transformation Office.
    02
     
    Mar
    Honoring the country's veterans at the National Veterans Memorial and Museum in Columbus, Ohio
    A collection of interlaced concentric arches rising from the earth define the outer walls of the National Veterans Memorial and Museum.
    More than 100,000 square feet of PERI’s VARIO system wall forms were required to place the National Veterans Memorial and Museum’s curved walls.

    press article

    Custom formwork and box-outs precisely form sweeping curves of unique concrete structure

    Designed as a tribute to veterans, the Memorial Museum will feature interactive and educational exhibits, beautiful landscaping, and iconic architecture, including the spiral processional rising to a rooftop sanctuary. The elegant, sweeping curves of the three interlaced cast-in-place reinforced concrete rings that define the structure belie the complexity of the project’s design and construction. 
    05
     
    May
    The new PERI ACS Core 400 hydraulic formwork system for high-rise cores on the Alta Roosevelt project, currently under construction in Chicago, IL
    The green hydraulic cylinder pushes off of the yellow climbing bracket to advance the red working bracket – which carries the entire system, consisting of formwork and platforms – to the next level. The climbing bracket will later re-use the same anchor points as the working bracket, resulting in significant time savings.
    The high capacity hydraulic cylinders allow carrying the concrete placing boom on top of the system which facilitates pouring of the decks around the core.

    press article

    PERI Launches New Self-Climbing Formwork System ACS-Core 400 in the US

    PERI USA has released a new heavy duty hydraulic climbing formwork system specifically made for the construction of concrete cores in high-rise buildings.
    03
     
    Mar
    The realization of starter units which form the foundation for the tunnel-in-tunnel. This area is formed with custom steel formwork. The two support areas – one for the rising wall, another for the prefabricated panel which is mounted at the end of all reinforced concrete work and subsequently forms the bottom carriageway slab – are clearly visible.
    The rising walls are concreted directly on the starting units which in turn form the support for the upper roadway. Two MAXIMO Formwork sets ensure fast, efficient concreting of the 4.50 m high walls.
    The slab was subsequently concreted by means of a total of six formwork carriages – constructed using the back-step construction method.

    press article

    PERI Formwork Carriage follows one of the world´s largest tunnel boring machines

    As a replacement for the elevated viaduct that is used daily by 110,000 vehicles, a 3.2 km long tunnel is currently being constructed. PERI planned and delivered a project-specific formwork solution for the realization of the double-storey carriageway whereby the previously drilled tunnel tube length is being concreted in three sections each time.
    09
     
    Feb
    Within the last year, the universal formwork system DUO has been tried and tested on several jobsites in the US and around the world to ensure it meets all contractors requirements.
    DUO panels are clamped together in seconds with a coupler resembling a door handle in both appearance and motion. Without the need of any tools, this makes DUO a silent system, especially useful in residential applications.
    Walls and foundations are formed quickly and efficiently with very few parts and pieces required.

    press article

    PERI Launches Lightweight Polymer Formwork System DUO in the US

    PERI USA launches a new lightweight formwork system made from fiber reinforced polymer. The versatile panels feature 3 in 1 functionality and can be used to form walls, slabs and columns.
    23
     
    Jan
    The individual, pre-assembled formwork units are provided with a QR code which allows direct access to a wide range of data via one mouse click. Thus, drawings or assembly instructions are linked with the 3D model.
    Checklists for previously defined workflows ensure perfect, digital documentation - directly linked to the relevant formwork model.
    Points to be clarified or even collisions can be marked and described directly on the model by construction team personnel. The solution-relevant information is also transparent for all project participants via defined communication channels.

    press article

    Practical applications for BIM

    PERI is currently planning the formwork and scaffolding solution for the construction of the Filstal Bridge on the Wendlingen-Ulm rail connection. This bridge was defined by the Federal Ministry of Transport and Digital Infrastructure (BMVI) as one of four pilot projects whereby the application of Building Information Modeling (BIM) is being tested and scientifically evaluated. This article describes some specific BIM practical applications which PERI has defined and implemented on this bridge in close collaboration with the contracting JV, Max Bögl / Porr.
    19
     
    Jan
    Through the integrated scaffold nodes on the PERI UP Easy Frame, ledgers, supports and console brackets can be directly connected. This makes it possible, e.g., to also easily mount external flights of stairs; these provide convenient and safe access to all areas.
    The integrated protection against lifting in the scaffold decking in detail: the integrated clamp engages the rectangular ledger and thus secures the position of the decking. PERI UP decks are also secured against lifting after installation without requiring any additional components.
    PERI UP decking always completely covers the entire axial dimesnions; there are no gaps or offsets between the decks – both from bay to bay as well as decks positioned parallel to each other. Covers for gaps in the decking are not required.

    press article

    From planning to implementation

    Enhanced safety along with maximum flexibility: the new PERI UP Easy* facade scaffold system solves two of the most important challenges faced in day-to-day construction site operations as the new frame scaffold supports safe and fast assembly. In addition, the integrated scaffolding nodes allows PERI UP Easy to be combined with the PERI UP Flex modular scaffolding thus ensuring maximum flexibility even when dealing with complex building geometries. Furthermore, PERI offers its customers a wide range of services relating to planning, tendering and project execution through to the entire planning and construction process.
    18
     
    Oct
    BAU 2017

    press article

    PERI at BAU 2017

    What can one of the largest internationally operating manufacturers of scaffolding and formwork systems possibly offer smaller construction companies, tradesman or even municipal building enterprises? Quite a lot as it happens – as shown by the range of options PERI is presenting at BAU 2017. The fact is such companies can also profit from innovative products, supporting services and the know-how gained from major projects. 
    19
     
    Apr
    PERI exhibition tent at bauma 2016
    bauma 2016: PERI exhibition hall
    bauma 2016: PERI formwork technology at a glance

    press article

    bauma 2016: An outstanding success for PERI

    At the 32nd Edition of the World´s Leading Trade Fair for Construction Machinery, Building Material Machines, Mining Machines, Construction Vehicles and Construction Equipment, around 175,000 visitors were recorded at PERI´s specially erected exhibition hall. The biggest attractions featured a number of interesting innovations: DUO Universal Formwork, SKYMAX Slab Formwork and the ACS Core 400 Core Climbing Formwork. PERI Managing Director, Alexander Schwörer, confirmed: "For us, bauma 2016 was a great success, and we are very satisfied with the positive feedback as well as the high quality of the fair visitors."
    12
     
    Apr
    The new PERI UP scaffolding system is a "lightweight" among steel facade scaffoldings, and, in addition, it provides a high level of safety in the system: the guardrail for the next level is installed together with the Easy* Frame from the lower scaffolding level without requiring any additional components.
    Both the combi decking with a 66 cm width as well as the 33 cm wide steel decks are designed with the integrated lock against lift off. They can be removed at any time. Without exception, all decking covers the entire system width; there are no gaps between the decks.
    With PERI UP Easy*, internal and external corners are executed quickly and with very few system components.

    press article

    PERI Scaffolding Technology at bauma 2016

    Reports about new products for the target group of scaffolding contractors and industrial companies
    12
     
    Apr
    For complex projects in civil engineering bridge construction, e.g. balanced cantilever solutions, PERI now provides even better support for its customers.
    Especially for use in high-rise building cores with medium to large dimensions, PERI has developed a core self-climbing formwork with a very high load-bearing capacity, all-round safety features and a continuous climbing procedure.
    With the type-tested VARIOKIT Cantilevered Parapet Bracket and an appropriate anchoring, PERI now provides a closed solution for parapet refurbishment.

    press article

    PERI Engineering Construction at bauma 2016

    Information about new products for the target group of engineering companies (bridge and tunnel construction; climbing technology)
    12
     
    Apr
    PERI at the bauma 2016
    Company result in 2015
    Newly developed PERI apps

    press article

    Best solving expertise in formwork and scaffolding

    General information on our bauma appearance and the importance of bauma as an innovation platform; notes to the PERI project expertise and its presentation at bauma; information and news about PERI services and software solutions
    16
     
    Jun

    press article

    Formwork in every shape and dimension – even faster with the new CNC system

    PERI is keeping pace with this trend: with individual formwork solutions, the formwork and scaffold expert ensures that complicated designs become reality. In order to increase the required capacity at the Weissenhorn formwork assembly plant, a second state-of-the-art CNC timber processing facility started operations in the spring of 2014.
    16
     
    Apr

    press article

    Competent handling of renovation work with project-specific solutions

    Construction work on existing buildings frequently places high demands on clients, planners and building contractors. The entire planning procedure as well as the equipment to be used must be adapted to match the project-specific characteristics of the structure and, in particular, the constructional environment. With a wide range of products and their sophisticated use, PERI succeeds in finding the most suitable and cost-effective solution for each of the upcoming tasks.
    03
     
    Feb
    Pegasus Sculpture, USA - The 33 m high and 60 m long sculpture ensemble, featuring Pegasus and a dragon, was realised in a larger than life size. With the help of the PERI UP solution, more than 1,000 bronze castings could be assembled and welded on site.
    Pegasus Sculpture, USA - The PERI UP Rosett Flex modular scaffold system provided safe working conditions for the craftsmen and metal designers during the realisation of the 33 m high bronze work of art.
    Pegasus Sculpture, USA - PERI UP was flexibly adapted to suit the organic shape of the bronze sculpture in 25 cm increments and thus provided optimum conditions for all necessary operational steps: adjustment, welding, processing, chasing and patinating.

    press article

    Super-sized bronze casting: 3D-puzzle on PERI UP scaffolding

    For the erection of the extraordinary Pegasus bronze sculpture in Miami/Florida, PERI UP Rosett Flex provided optimal working conditions. The modular scaffold system proved once again just how flexible and versatile it is, adapting to the complex geometry in 25 cm increments.
    11
     
    Sep

    press article

    PERI Apps make construction site operations easier

    PERI has developed resp. updated three of its helpful apps for formwork and scaffolding: Formwork Load Calculator, MULTIFLEX Configurator and ST 100 Stacking Tower Configurator are now available on the website featuring an extensive range of benefits.
    01
     
    Jul
    Capitol Hill Station, Seattle, USA - The VARIOKIT formwork carriage and HD 200 heavy-duty props were used for the construction of the new subway station in Seattle.
    Capitol Hill Station, Seattle, USA - PERI formwork carriage solution ensures savings on assembly time and expense.
    Capitol Hill Station, Seattle, USA - PERI TRIO, VARIO GT 24, SB Brace Frame, MULTIFLEX, MULTIPROP and PERI UP formwork and scaffold systems supplemented the comprehensive project solution.

    press article

    System-based project solution saves time and money

    The formwork and scaffolding solution provided for the construction of the new subway station in Seattle was the result of competent engineering and a project-specific construction kit system. In addition to the widest possible use of rentable PERI system components, the optimized construction method in particular ensured significant time and cost savings.
    07
     
    Jan
    Smithland Hydroelectric Power Plant - The Smithland hydroelectric power plant is equipped with 3 turbines; due to the extremely tight construction schedule, all three tubes with their constantly changing cross-sections are being realized at the same time.
    Smithland Hydroelectric Power Plant - For the construction of the concrete tubes, PERI planned and assembled multi-curved formwork units. The final assembly of the formwork and shoring construction is carried out on site.
    Smithland Hydroelectric Power Plant - The fully assembled units comprising of formwork units and raised formwork are lifted by crane into the concreting position.

    press article

    From the planning to implementation – comprehensive engineering services for construction of the power plant shell

    For the Smithland hydropower station, PERI provides a customized formwork and shoring solution. The extremely tight construction schedule, massive structural elements and in part multi-curved surfaces required a huge number of specially-made 3D formwork units in addition to large quantities of system equipment.
    05
     
    Dec
    With PERI MAXIMO, the latest edition on panel formwork contains for the first time a system with one-sided tie technology – which has been proven to save up to 50 % on workload.
    PERI press release - Documented efficiency: shuttering times reduced by 50 % with Maximo - New working time reference values for panel formwork
    PERI - press release - New working time reference values for panel formwork

    press article

    Documented efficiency: shuttering times reduced by 50% with Maximo

    The reference times featured in the "Arbeitsorganisation Bau" handbook are a valuable basis for construction site calculations in Germany. With Maximo, the latest edition on panel formwork contains for the first time a system with one-sided tie technology – which has been proven to save up to 50 % on workload.
    04
     
    Nov
    Eemshaven Power Plant, Netherlands - For the power plant construction in Eemshaven, the industrial scaffold system PERI UP has clearly demonstrated its flexibility and adaptability.
    Eemshaven Power Plant, Netherlands - Working platforms and integrated access means for the welding and insulation operations on the two electric filters for the flue gas desulphurisation are based on the PERI UP Rosett Flex modular scaffolding system.
    Eemshaven Power Plant, Netherlands - For the spatial scaffolding of the filter funnel, the metric grid system of the PERI UP scaffolding system which allows the bay widths to be divided as required is a particular advantage.

    press article

    High level of working safety for scaffold assembly and use

    As part of the planned construction of the new power plant, the Peri Up Rosett Flex has proved to be extremely adaptable during the assembly phase – in so doing, it has fulfilled the highest requirements regarding the installation of the working platforms. The fact that the modular scaffolding can be assembled with the guardrail in advance means that the safety level required during scaffold erection is already guaranteed to a high degree.
    07
     
    Jun
    PERI press release - Apps and Tools

    press article

    Digital solutions with added value

    At bauma 2013, PERI presented a number of new digital innovations which included the launch of the PERI handbook as an application for mobile devices. In addition, the company unveiled applications for determining the concreting speed as well as a configurator for the MULTIFLEX slab formwork designed for use on smart phones and tablets.
    03
     
    May

    press article

    Increased profitability for VARIOKIT tunnel formwork carriage

    At this year's bauma, PERI presented new system components and a wide range of further developments for formwork and scaffolding technology. Also the tunnel formwork carriage exhibited at the fair is characterized by detail improvements that have been designed to increase the cost-effectiveness and accelerate the assembly.
    02
     
    May

    press article

    Impressive performance with extremely positive feedback at the world´s biggest fair

    More than 530,000 visitors from over 200 countries attended bauma 2013. Every third visitor to the fair visited the purpose-built PERI exhibition hall which was located on the Open-Air Area North. On over 4,000 square metres, the Weissenhorn-based company presented proven formwork and scaffolding systems as well as numerous innovations.
    23
     
    Apr

    press article

    Innovative technology, comprehensive solutions and customer-oriented presentations at bauma 2013

    At this year´s bauma, PERI presented a number of new formwork and scaffolding systems as well as a wide range of further developments. On an area of over 4,000 m², the exhibition offered visitors the opportunity to learn more about proven and innovative technology at first hand.