The 7 km long west section of the Thames Tideway Tunnel from Acton Storm Tanks site in West London towards Carnwath Road Riverside in South West London was supported by KERN Tunneltechnik.
KERN Tunneltechnik has engineered and supplied the automated tunnel formwork system with live data analysis and PLC control units, comprising of 6 hydrostatic shutters, to support these works. The fullround formworks with a diameter of 6.5 m have been moved and set by 2 multifunction gantries. The system has been completely pre-assembled and tested at KTS.

KERN Tunneltechnik

Leading the Way in Tunnel Construction Innovation

For many mining tunnel projects, standard solutions cannot cover all requirements. With our Partner KERN Tunneltechnik, we provide solutions that go beyond what standard systems can achieve.

Together with KERN Tunneltechnik, a proud member of the PERI Group, we embody a vision that sets us apart in the tunnelling infrastructure industry. Our goal is to become the foremost provider of advanced machinery and comprehensive solutions for the underground infrastructure sector.
Our expertise in engineering propels us forward, leveraging cutting-edge technologies to offer a diverse range of tailor-made products and services. From fully automated formwork and logistics systems to backup equipment and special service machinery, our portfolio is designed to cover the entire lifecycle of a project. This includes design, production, on-site installation, and project supervision. With respect to digitialisation, we are at the forefront of introducing smart tunnel construction technologies. 

Our international presence and the successful completion of numerous major projects are a testament to our capability to revolutionize the market for formworks and tunnelling machines.
From the initial concept to the installation of complete system, our team of experts ensures that machines are developed to meet the highest industry standards.

Find out more about KERN Tunneltechnik


KERN - Solutions and Projects