The Project
Impressions from the project process
Project Information
Requirements
The contractor used 85,000 ft2 of SKYDECK to form the lower levels over a five-month period. Forming the tower levels was done over 16 months using 33,000 ft2 of SKYDECK, along with three levels of PEP Ergo shoring and 42 LPS lightweight climbing protection panels. The setup also required three outriggers, and a PERI UP Flex Stair tower provided access for personnel. The SKYDECK system’s ease of use and light weight components were particularly valuable on this project because all the forming could be set from below while the LPS perimeter protection screens provided a safe workspace at all times.
Solutions
LPS is the alternative to heavy, enclosed protection panel systems. LPS can be used as perimeter protection or with supplementary working platform for access to slab edge formwork.


Ben Larsen
Superintendent
Are you working on a project like this?
Call us on +1 410-712-7225 to discuss your requirements further.
San Diego, CA United States


San Diego, CA United States