The Project
Impressions from the project process
Project Information
Ian Hanly
Superintendent
The lack of shoring rights on two sides of our project required a unique top-down construction method, and after reviewing multiple shoring systems, the PERI system stood apart from the group. Their team engaged in project meetings and engineered a series of tables which could be suspended from a steel superstructure above. PERI prefabricated the bulk of the large tables offsite, which really helped streamline the initial installation onsite, especially since our urban site had very limited laydown and storage space. Although the top-down sequence was unfamiliar to our team, the familiarity with PERI and their willingness to help overcome this unique challenge made the project a success.