Together with our customers we create great things. Whether scaffolding, skyscrapers, bridges or tunnels, we will show you which projects we have realized together with our customers.

All Projects

PERI Teamed up with McCarthy and the St. Louis Community to support building a home for a police officer tragically injured in the line of duty.
RCSI was commissioned to upgrade the existing Fall Creek Reservoir fish facility to comply with current environmental criteria and build a fish lab to transport native salmon and endangered species.
With only four pounds per square foot, DUO is the ideal handset formwork system for this residential project
DUO Handset Column Formwork is selected to form approximately 74 columns per level of an Orange County administration building.
Modular VARIOKIT trusses enable fast preassembly. When used with VPS Support Jacks, this system ensures efficient and secure construction.
I-65 North Split Project
The defined arrangement of individual MAXIMO panels allows the visually appealing design of concrete surfaces with a clean concrete finish
RUNDFLEX was used to form the round walls of the digester tanks and 42' tall stacked MULTIPROP were used to support the slab formwork.
A complex pour with irregular corners, a slope transition, and a wall batter was realized with TRIO.
Blue Lake Dam Expansion in Sitka, Alaska
Capitol Hill Station, Seattle, USA - The VARIOKIT formwork carriage and HD 200 heavy-duty props were used for the construction of the new subway station in Seattle.
Smithland Hydroelectric Power Plant - The Smithland hydroelectric power plant is equipped with 3 turbines; due to the extremely tight construction schedule, all three tubes with their constantly changing cross-sections are being realized at the same time.
Milwaukee's premier retirement community, Saint John's On The Lake, a three-tower complex delivers breathtaking views of Lake Michigan.
The strong hydraulics and climbing brackets allow the ACS Core 400 system to climb the core. The single stroke cylinder enables fast climbing.
The extension consists of the Welcome Pavilion, the River Pavilion, and the Skylight Pavilion.
(Photo: Cowles Graphic Design)
PERI was awarded as the supplier for the construction of the planetarium walls.
The project-specific solution for realising the inner lining was based on a moveable supporting structure consisting of system components taken from the VARIOKIT Engineering Construction Kit.
State Route 99 Tunnel, United States of America
Alta Roosevelt at Financial and Polk Street in Chicago
The ascent of all cores was achieved with DOMINO, CB, and BR platforms.
PERI Boston Seaport 1
UCI Medical Center
Podium construction with SKYDECK
SKYDECK Slab Formwork
The building perimeter is safely enclosed by PERI LPS Light Protection Screen
GARAGEDECK Beam
The Garagedeck Beam is the heart of the system
The Couture Milwaukee, WI
Using two PERI Self Climbing Systems enabled Clark Concrete’s crews to frame the elevator walls of both the north and south cores simultaneously and without relying on the single tower crane.
A prestigious new office tower with sweeping views of Long Island City, NY
One Manhattan Square, 250 South Street, New York, NY
Three floors of LPS protection can be moved independently by hydraulics or crane at any time in the construction cycle.
The New York skyline just got another building added to it
The self climbing LPS Light Protection Screen safely encloses the structure
400 Park Avenue South, New York, NY
399 Fremont is a residential tower in San Francisco
The unique structure with its many cantilevers required innovative shoring and support solutions
The Gerald Desmond Bridge, built in 1968, has been an ongoing concern due to a low vertical clearance for large cargo containers as well as being in a highly active seismic zone.
The new Kosciuszko Bridge is a key element of the Brooklyn Queens Expressway
Bagnell Dam
The East End Crossing is part of the Louisville-Southern Indiana Ohio River Bridges Project, an 8.5-mile roadway that will increase cross-river mobility and alleviate traffic congestion in the area.
lax apm
centene
A crane was used to lift the VST Heavy-duty shoring tower.
Perspective under the bridge to be widened with additional hammerhead caps adjacent to the existing bridge.
Seattle, WA Aquarium
Pegasus Sculpture, USA - The 33 m high and 60 m long sculpture ensemble, featuring Pegasus and a dragon, was realised in a larger than life size. With the help of the PERI UP solution, more than 1,000 bronze castings could be assembled and welded on site.
broad museum cover
Swiss Krono is one of the world’s largest producers of engineered wood products, especially laminate flooring. The subcontractor supplying the scaffolding for the US expansion selected the PERI UP Rosett Flex modular scaffolding system for the project, in part due to its optimal adaptability, high level of worker safety, and fast assembly.
Providing internal parking was a key element in the creation of a pedestrian-oriented atmosphere for this high-density mixed-use apartment
project in the center of San Diego.
SKYDECK panels feature integrated plywood and can be safely erected from above, thanks to the components' light weight of 35 lbs per panel.
Connect 4 is a project consisting of highway bridges and overpasses for the I-635/SH 121 Interchange
Using ACS Core 400 reduced the demands on cranes.
PERI UP Shoring Towers make quick work of the concrete slab at Walcrest Water Reclamation Facility, Dallas, TX
Crews pouring 21 foot tall concrete wall using TRIO 330 panels, resulting in a neat tie pattern and clean concrete finish
The two 34-story residential towers at in downtown Los Angeles will provide 648 high-end residential condominiums and more than 50,000 ft2 of ground level retail space in an eight-level podium.
Nation’s Largest 3D Printed Home
MULTIPROP frames offer a lightweight shoring solution that provides easy adjustability and high load-bearing capacity.
GRIDFLEX was used as the shoring system on this project
Prefabricated from standard components, PERI SKYTABLES shorten cycle times and provide a very high level of safety, particularly at the slab edges.
Due to site restrictions Centre 425 Bellevue had to be constructed using a unique top-down solution
PERI GT 24 girders on high load bearing, lightweight aluminum MULTIPROP shores.
Transbay Block 6, San Francisco
8th & Howell Hotel, Seattle, Washington
Tall shoring towers support a custom formwork solution to create a unique concrete ribbon structure on top of the building
Park Tower at Transbay Block 5, San Francisco, California
salesforce tower
500 West Trade, a 14-story tower surrounded by a 3-story podium garage.
Transbay Block 8, San Francisco, California
Using an ACS 400 on each of the two tower cores greatly reduced demands on the cranes.
A new 34-story residential tower is under construction at Park Boulevard and Market Street in downtown San Diego, Calif. The new residential tower and an adjoining four-story facility mark the expansion of the University of California, San Diego, into the city’s East Village neighborhood.
The Solitair Brickell in Miami was among one of the first projects in the US to be built with the new ACS 400 self climbing core formwork system
Broadstone South End Parking Garage Charlotte, NC
MAXIMO Core Formwork allows lifting and resetting the entire inside formwork in one piece
Honoring the country's veterans at the National Veterans Memorial and Museum in Columbus, Ohio
The Des Plaines tunnel will connect directly to the McCook Reservoir and is built to allow stormwater to drain from the city of Chicago
Two 175 m high piers at a distance of 472 m from each other, take the loads of this cable stay construction which connects both sides of the Cooper River.
The Ironton Russel Bridge replacement marks the highest span in Ohio
The client cycled 16 units of VST shoring towers to support the 31 caps.
The crew is building the shoring tower on top of the trusses supported by MULTIPROPS, thus allowing the crews and equipment to pass through underneath.
 Fairfield County, SC
Northwest view of the Turnpike I-76 Beaver River crossing.
The expansive wave-shaped skylight being erected over what was formerly the mail sorting room of New York’s historic James A. Farley Post Office is perhaps the single most eye-catching feature of this $1.6 billion renovation.
Brightline Rail
More than 29 different beam configurations in a 210,000 sq. ft. quick turnaround area with limited access area required a highly flexible solution.
PERI supplied the concrete forms for the construction of several TEXRail stations in Dallas, Texas
Marine Oil Terminal 3
The 50-year-old dam was deemed structurally deficient by the Department of Environmental Protection, resulting in draining the lake and relocating the fish to conduct the repairs.
Each tank has an inside diameter of 55‘, with 18“ thick walls that are 34‘ tall.
MULTIPROP shoring towers were stacked 42’ high to support the slab formwork for the digester tank
VARIOKIT is a construction kit primarily comprised of rentable 5” and 8” double C-channel steel members and adjustable spindles for various formwork applications
The PERI integrated scaffold program increases safety, predictability and efficiency on large industrial sites by providing planning and monitoring software as well as one of the safest and most efficient scaffolding products on the market
LNG liquid gas reservoirs, Cameron, USA - In the US state of Louisiana, three enormous liquid gas tanks were simultaneously realized using PERI know-how. Each of the structures has an 80 m diameter and a wall height of 44 m.

Interested in how PERI can support your next project?