A 2.57-acre lot located adjacent to the Mattapan MBTA Red Line station will be a mixed-use redevelopment project consists of 135 residential rental units, 10,000 sq. ft. of commercial and retail space, a 70-space parking structure, and 50 surface parking spots. Plans include a secondary building comprised of 9 homeownership units in the future. The transit-oriented property will provide affordable and market-rate housing, a variety of transportation options, and direct access to the Neponset River Greenway.
Due to the efficiency obtained on another project in downtown Boston using a PERI hydraulic climbing system, the contractor selected 20,000 sq. ft. of PERI SKYDECK for the project. The SKYDECK slab formwork system with dropheads are used for the first level structural slab and second level post-tension slab. The panels and beams of SKYDECK will be cycled to subsequent pours while props, dropheads, and coverstrips remain in place as reshores.
Additionally, over 4,000 sq. ft. of PERI PD-5 10K shoring is on the project.
Customer
Marguerite Concrete