The Project
Impressions from the project process
Project Information
![John Longarini](https://cdn.peri.cloud/.imaging/lPortrait/dam/b21a996a-afd8-4ec9-9431-da9f4f32fe2d/63786/john-longarini.jpg)
![John Longarini John Longarini](https://cdn.peri.cloud/.imaging/lPortrait/dam/b21a996a-afd8-4ec9-9431-da9f4f32fe2d/63786/john-longarini.jpg)
John Longarini
Project Manager
PERI LPS has allowed us to turn a floor over every three to four days, containing debris and material inside the envelope of the tower footprint and eliminating the need for fall protection on the exterior at the level we are about to frame before men start working.
Are you working on a project like this?
Call us on +1 410-712-7225 to discuss your requirements further.
![Three floors of LPS protection can be moved independently by hydraulics or crane at any time in the construction cycle.](https://cdn.peri.cloud/.imaging/mWide/dam/a1a88cff-4cb0-443e-a8ab-279e8e4eef44/71590/three-floors-of-lps-protection-can-be-moved-independently-by-hydraulics-or-crane-at-any-time-in-the-construction-cycle.jpg)
![Three floors of LPS protection can be moved independently by hydraulics or crane at any time in the construction cycle. Three floors of LPS protection can be moved independently by hydraulics or crane at any time in the construction cycle.](https://cdn.peri.cloud/.imaging/mWide/dam/a1a88cff-4cb0-443e-a8ab-279e8e4eef44/71590/three-floors-of-lps-protection-can-be-moved-independently-by-hydraulics-or-crane-at-any-time-in-the-construction-cycle.jpg)