Long Island City, New York

Buildings

Form structures that stand tall

From universities to residential high-rises, we help shape buildings that bring a city to life. With a range of climbing and formwork options to suit your requirements, our temporary works systems make it possible to construct in challenging environments.

Focus Project

Building Projects

With only four pounds per square foot, DUO is the ideal handset formwork system for this residential project
centene
The two 34-story residential towers at in downtown Los Angeles will provide 648 high-end residential condominiums and more than 50,000 ft2 of ground level retail space in an eight-level podium.
The Garagedeck Beam is the heart of the system
The ascent of all cores was achieved with DOMINO, CB, and BR platforms.
Nation’s Largest 3D Printed Home
SKYDECK panels feature integrated plywood and can be safely erected from above, thanks to the components' light weight of 35 lbs per panel.
Podium construction with SKYDECK
MULTIPROP frames offer a lightweight shoring solution that provides easy adjustability and high load-bearing capacity.
GRIDFLEX was used as the shoring system on this project
Prefabricated from standard components, PERI SKYTABLES shorten cycle times and provide a very high level of safety, particularly at the slab edges.
Providing internal parking was a key element in the creation of a pedestrian-oriented atmosphere for this high-density mixed-use apartment
project in the center of San Diego.
Due to site restrictions Centre 425 Bellevue had to be constructed using a unique top-down solution
GARAGEDECK Beam
The strong hydraulics and climbing brackets allow the ACS Core 400 system to climb the core. The single stroke cylinder enables fast climbing.
SKYDECK Slab Formwork
The building perimeter is safely enclosed by PERI LPS Light Protection Screen
PERI Boston Seaport 1
PERI Teamed up with McCarthy and the St. Louis Community to support building a home for a police officer tragically injured in the line of duty.
The New York skyline just got another building added to it
PERI GT 24 girders on high load bearing, lightweight aluminum MULTIPROP shores.
The self climbing LPS Light Protection Screen safely encloses the structure
Using two PERI Self Climbing Systems enabled Clark Concrete’s crews to frame the elevator walls of both the north and south cores simultaneously and without relying on the single tower crane.
Transbay Block 6, San Francisco
A prestigious new office tower with sweeping views of Long Island City, NY
The Couture Milwaukee, WI
8th & Howell Hotel, Seattle, Washington
Tall shoring towers support a custom formwork solution to create a unique concrete ribbon structure on top of the building
Park Tower at Transbay Block 5, San Francisco, California
400 Park Avenue South, New York, NY
salesforce tower
Using ACS Core 400 reduced the demands on cranes.
One Manhattan Square, 250 South Street, New York, NY
Three floors of LPS protection can be moved independently by hydraulics or crane at any time in the construction cycle.
Milwaukee's premier retirement community, Saint John's On The Lake, a three-tower complex delivers breathtaking views of Lake Michigan.
The unique structure with its many cantilevers required innovative shoring and support solutions
500 West Trade, a 14-story tower surrounded by a 3-story podium garage.
Transbay Block 8, San Francisco, California
Alta Roosevelt at Financial and Polk Street in Chicago
Using an ACS 400 on each of the two tower cores greatly reduced demands on the cranes.
A new 34-story residential tower is under construction at Park Boulevard and Market Street in downtown San Diego, Calif. The new residential tower and an adjoining four-story facility mark the expansion of the University of California, San Diego, into the city’s East Village neighborhood.
399 Fremont is a residential tower in San Francisco
The Solitair Brickell in Miami was among one of the first projects in the US to be built with the new ACS 400 self climbing core formwork system
Broadstone South End Parking Garage Charlotte, NC
MAXIMO Core Formwork allows lifting and resetting the entire inside formwork in one piece
The extension consists of the Welcome Pavilion, the River Pavilion, and the Skylight Pavilion.
(Photo: Cowles Graphic Design)
Seattle, WA Aquarium
broad museum cover
PERI was awarded as the supplier for the construction of the planetarium walls.
Honoring the country's veterans at the National Veterans Memorial and Museum in Columbus, Ohio
Pegasus Sculpture, USA - The 33 m high and 60 m long sculpture ensemble, featuring Pegasus and a dragon, was realised in a larger than life size. With the help of the PERI UP solution, more than 1,000 bronze castings could be assembled and welded on site.
The defined arrangement of individual MAXIMO panels allows the visually appealing design of concrete surfaces with a clean concrete finish
DUO Handset Column Formwork is selected to form approximately 74 columns per level of an Orange County administration building.
UCI Medical Center