Industrial

Scaffolding

Flexibility and built-in safety at every level

With features like our gravity lock and advanced guardrail system, the PERI UP range offers security and speed at the same time. Whether it’s access or shoring, our scaffolding experts provide support from design to delivery.

Focus Project

PERI Scaffolding

The PERI integrated scaffold program increases safety, predictability and efficiency on large industrial sites by providing planning and monitoring software as well as one of the safest and most efficient scaffolding products on the market
Swiss Krono is one of the world’s largest producers of engineered wood products, especially laminate flooring. The subcontractor supplying the scaffolding for the US expansion selected the PERI UP Rosett Flex modular scaffolding system for the project, in part due to its optimal adaptability, high level of worker safety, and fast assembly.
LNG liquid gas reservoirs, Cameron, USA - In the US state of Louisiana, three enormous liquid gas tanks were simultaneously realized using PERI know-how. Each of the structures has an 80 m diameter and a wall height of 44 m.
Smithland Hydroelectric Power Plant - The Smithland hydroelectric power plant is equipped with 3 turbines; due to the extremely tight construction schedule, all three tubes with their constantly changing cross-sections are being realized at the same time.
Seattle, WA Aquarium
The strong hydraulics and climbing brackets allow the ACS Core 400 system to climb the core. The single stroke cylinder enables fast climbing.
Capitol Hill Station, Seattle, USA - The VARIOKIT formwork carriage and HD 200 heavy-duty props were used for the construction of the new subway station in Seattle.
lax apm
broad museum cover
Pegasus Sculpture, USA - The 33 m high and 60 m long sculpture ensemble, featuring Pegasus and a dragon, was realised in a larger than life size. With the help of the PERI UP solution, more than 1,000 bronze castings could be assembled and welded on site.
Providing internal parking was a key element in the creation of a pedestrian-oriented atmosphere for this high-density mixed-use apartment
project in the center of San Diego.
The Ironton Russel Bridge replacement marks the highest span in Ohio
The expansive wave-shaped skylight being erected over what was formerly the mail sorting room of New York’s historic James A. Farley Post Office is perhaps the single most eye-catching feature of this $1.6 billion renovation.